Skip to main content

Offshore pipeline news

 
 
 
 
 
 

TechnipFMC awards deepwater Karish to Corinth Pipeworks

The agreement covers 90 km, of 24 in. and 30 in. LSAW pipe material for the offshore gas pipeline that connects the subsea manifold at a maximum water depth of 1750 m to the receiving terminal onshore.

 
 
 

TUV SUD NEL completes building of £16m test facility

Once completed, the Advanced Multiphase Facility’s test range capability of operating pressures, temperatures, flowrates and metrology will be beyond anything currently available worldwide.