NTSB opens public docket for rupture investigation
Published by Sara Simper,
Editorial Assistant
World Pipelines,
The National Transportation Safety Board opened the public docket on 15 September 2022 as part of its ongoing investigation of the fatal, 15 August 2021, natural gas transmission pipeline rupture and fire near Coolidge, Arizona. The docket for this investigation includes more than 12 00 pages of factual information, including reports on pipeline operations, human performance, metallurgical testing, and emergency response efforts. The docket also includes interview transcripts, photographs, employee training records, and other investigative materials.
The docket contains only factual information collected by NTSB investigators; it does not provide the final report, nor does it contain analysis, findings, recommendations, or probable cause determinations. As such, no conclusions about how or why the rupture occurred should be drawn from the information within the docket. Analysis, findings, recommendations, and probable cause determinations related to the rupture will be issued by the NTSB in a final report at a later date.
A 30 in. pipeline owned and operated by Kinder Morgan, Inc., ruptured and released natural gas that ignited. The rupture resulted in an explosion, fire, and ejection of a 46 ft section of the pipeline. One residence was destroyed by the explosion and subsequent fire, resulting in two fatalities and one injury.
The public docket for this investigation is available online.
Read the article online at: https://www.worldpipelines.com/special-reports/20092022/ntsb-opens-public-docket-for-rupture-investigation/
You might also like
World Pipelines Podcast: Going global with IPLOCA
In this episode, Elizabeth Corner speaks to Georges Hage, Executive Secretary at IPLOCA, about IPLOCA's insights on the culture and characteristics of the pipeline contractor community, and how it works to support sustainable energy infrastructure.
Eni and the UK Government reach financial close for the Liverpool Bay CCS project
The project foresees the efficient repurposing of part of the offshore platforms as well as 149 km of onshore and offshore pipelines, and the construction of 35 km of new pipelines to connect industrial emitters to the Liverpool Bay CCS network.