Tellurian project receives FERC certificate
Published by Sara Simper,
Editorial Assistant
World Pipelines,
Tellurian Inc. announced that the US Federal Energy Regulatory Commission (FERC) issued the certificate on 21 April 2023 granting authorisation for Driftwood Pipeline, LLC’s Line 200 and Line 300, an approximate US$1.4 billion natural gas transmission project proposed to be located in Beauregard and Calcasieu Parishes, Louisiana.
The pipelines will have the ability to supply up to 5.5 billion ft3 of natural gas daily with virtually no emissions due to the implementation of electric-powered integrated compressor line (ICL) technology from Baker Hughes.
Tellurian President and CEO, Octávio Simões said, “Tellurian thanks the FERC for their thorough and collaborative review of our Driftwood Pipeline Project and we look forward to delivering natural gas in a cleaner and highly reliable way to Southwest Louisiana.”
Read the article online at: https://www.worldpipelines.com/project-news/26042023/tellurian-project-receives-ferc-certificate/
You might also like
Vallourec wins fourth major line pipe order from ExxonMobil Guyana
Vallourec wins another major order from ExxonMobil Guyana.