Skip to main content

EIA: Four new petroleum liquids pipelines have been completed in the US since 2023

Published by , Editorial Assistant
World Pipelines,


The US Energy Information Administration (EIA) has reported that since 2023, pipeline companies have completed four new petroleum liquids pipeline projects in the United States – three crude oil pipeline projects and one hydrocarbon gas liquids (HGL) project – according to EIA’s recently updated Liquids Pipeline Projects Database. No new petroleum product pipeline projects were completed during this period. Petroleum product pipelines carry gasoline, diesel, jet fuel, and other refinery products.

 

EIA: Four new petroleum liquids pipelines have been completed in the US since 2023

The completed projects are as follows:

    South Bend Pipeline is a 150 000 bpd pipeline developed by Bridger Pipeline, LLC, that transports crude oil about 137 miles from Johnsons Corner, North Dakota, to Baker, Montana. It was completed in 2023.
    Keystone Port Neches Link is a 630 000 bpd pipeline developed by Port Neches Link, LLC, a joint venture of TC Energy and Motiva Enterprises, that begins at the Sunoco Logistics terminal in Nederland and ends at Motiva’s terminal in Port Neches (both in Texas). The pipeline is approximately five miles in length and was completed in 2023. The Motiva section is a 30 in. diameter pipe, and the TC Energy section is 36 in. diameter pipe.
    Borger Express Pipeline is a 90 000 bpd pipeline developed by Navigator Energy Service that transports crude oil about 195 miles from Major County, Oklahoma, to Hutchinson County, Texas. It was completed in 2023.
    Seminole Red Pipeline was converted by Enterprise Products Partners from a crude oil pipeline back to an HGL pipeline while it builds Bahia Pipeline, another HGL pipeline project that will also service the Permian Basin. Seminole Red Pipeline was originally an HGL pipeline before it was converted to a 210 000 bpd crude oil pipeline in 2019. The conversion back to HGL was completed in 2024.

Read the original article here.

Read the article online at: https://www.worldpipelines.com/project-news/22102024/eia-four-new-petroleum-liquids-pipelines-have-been-completed-in-the-us-since-2023/

You might also like

 
 

Embed article link: (copy the HTML code below):