Evaluation of the Vojany-Uzhorod pipeline Open Season
Published by Elizabeth Corner,
Senior Editor
World Pipelines,
Increased interruptible capacity of 4.5 million m3/d (46 800 MW/hr) has been booked by shippers until the end of 2019, for the Vojany-Uzhorod pipeline.
Interest of the shippers significantly exceeded the offered capacity. Entire booked capacity of the Vojany-Uzhorod pipeline has reached 11.5 billion m3/yr (31.5 million m3/d).
Increased interruptible capacity has been increased due to the technical measures taken on the Ukrainian side.
In order to participate in the Open Season procedure, interested registered until 17 November, 2014. Binding requests for transmission capacity were open until 19 November, 2014.
Edited from source by Elizabeth Corner
Read the article online at: https://www.worldpipelines.com/project-news/21112014/evaluation-of-the-vojany-uzhorod-pipeline-open-season/
You might also like
World Pipelines Podcast: Supporting young pipeliners
In this episode, Elizabeth Corner speaks to Josiah SooTot, Chair at Young Pipeliners International (YPI) and Pipeline Integrity Engineer at ExxonMobil, about what Young Pipeliners International does for young professionals in the pipeline industry.
Maximising productivity with maxi rig maintenance
Kelly Beller, Vermeer Corporation, USA, makes the case that operators can boost horizontal directional drilling productivity by paying attention to maxi rig parts.