Intertec is demonstrating an equipment shelter at EGYPS (the Egypt Petroleum Show). The outdoor Peri Shelter, for protecting field-based instrumentation and automation, makes all the system components that are required for normal operation accessible via the exterior of the building. This 'inside out' design approach can reduce shelter sizes, and simplify construction and installation.

Among many design problems and costs that can be avoided are the need to make plant buildings blast proof and fire resistant because personnel might be inside, major reductions in size by eliminating desks, control panels, door opening spaces, aisles/walkways/escape routes, and simplified internal atmospheric control requirements.

The shelter meets a growing problem faced on automation projects. Automation systems are becoming more complex, due in large part to ever more sophisticated safety technology. Adding such equipment into already crowded plant areas – often close to the process in hazardous areas – has become a major challenge. And the problems that result can contribute significantly to project cost overruns, a situation that some industry insiders describe as a crisis.

The outdoor shelter concept has been recently proved by Intertec on a refinery upgrade project in the Middle East. Eight Peri Shelters are being used to house new PLC-based control and safety systems for a refinery's burner systems. Panel-mounting enclosures on the exterior provide access to electrical connection and I/O termination points, and cooling systems. A touchscreen HMI panel that sits on an external wall allows operators on the ground to monitor the PLC or make adjustments to control programmes locally via an inspection door.

The shelters also feature a fault tolerant cooling system that is ideal for the Middle East and other hot locations, based on a combination of passive and active cooling. Passive cooling is extremely reliable and operates independently of an electrical power supply – ensuring that the shelters remain cool even during a power outage. An additional powered water cooler improves the efficiency of the cooling system. A third air cooler provides an independent back up.

"Peri Shelters can cut project costs by millions of dollars, and cut months off project timescales" said Intertec's Director for the GCC region, Rohit Nath. "For turnaround projects in existing plants, the unmanned shelters avoid the need to install larger and expensive manned buildings such as satellite instrument houses or remote instrument enclosures. They fit easily in crowded spaces, close to the process in hazardous areas. And, with the benefit of Intertec's unique hybrid cooling technology, they are also ideal for SCADA applications in remote locations and on pipelines."

Intertec's concept is being demonstrated at the EGYPS exhibition on the booth of its system integration partner MISC Automation Systems, using a scale model of an example shelter.

Read the article online at: https://www.worldpipelines.com/equipment-and-safety/12022018/intertec-to-demonstrate-equipment-shelter-at-egyps/

You might also like

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Middle East pipeline news Africa pipeline news