Strohm’s TCP to support emergency response system
Published by Sara Simper,
Editorial Assistant
World Pipelines,
Strohm has been contracted to manufacture and deliver two thermoplastic composite pipe (TCP) flowlines to Australia’s largest natural gas producer, Woodside Energy Ltd. The technology will form an integral part of the relief well emergency response plans for the well construction phase of the Scarborough field development.
The development of the Scarborough field in the Exmouth sub-basin off the coast of Western Australia, will feature up to 13 subsea production wells to be constructed and tied-back to a floating platform moored in 900 m depth of water. Gas from the field will be processed at the expanded Pluto LNG export facility near Karratha. In its entirety, the development represents an investment of US$12 billion (AUS$16.2 billion).
The emergency response system, with two TCP Flowlines of 600 m lengths, will be stored onshore for timely deployment to the field in the unlikely event of a drilling-related source control incident. Two floating drill rigs would pump high-density kill fluid, utilising well kill manifolds on the seabed. The TCP Flowlines would be laid on the seabed to connect the manifolds, facilitating the comingling of kill fluid to a relief well.
This is the first time TCP has been chosen for this application. Strohm is the world’s first and largest manufacturer of the technology, which has a proven track record in the energy sector and is currently qualifying it for other applications to support the industry’s net-zero decarbonisation goals, such as green hydrogen transportation.
Strohm will deliver TCP Flowlines with each spooled onto storage and installation baskets which can be lowered to the seabed from a local inspection, maintenance and repair (IMR) vessel of opportunity.
Strohm VP Middle East & Asia-Pacific, Fabienne Ellington said: “Having recently successfully installed a TCP Jumper for Woodside in its Julimar field, we are very proud our technology has been selected for their vital emergency response system. This collaboration further develops the strong working relationship between our two companies.”
Strohm Representative, Australia, Robby O’Sullivan added: “The Scarborough reservoir is one of Australia’s largest discoveries and is estimated to contain 11.1 trillion ft3 of dry gas. TCP was chosen because it is a smoothbore, lightweight pipe and is easy to transport and deploy offshore, making it ideal in the event of an emergency response situation. It is also very compact and can be safely stored on spools or pallets.
“This project is also important to our business as it increases Woodside Energy Ltd.’s familiarity with TCP for future consideration as it continues to evolve to higher specification materials and applications.”
Woodside Energy Well Delivery Manager, Aaron McPhee said: “TCP Flowlines are another component in our suite of source control equipment for the Scarborough project. The technology allows us to implement a timely response as part of our source control plans.”
Read the article online at: https://www.worldpipelines.com/contracts-and-tenders/09082022/strohms-tcp-to-support-emergency-response-system/
You might also like
PetroChina ends its role as committed shipper on Trans Mountain pipeline
PetroChina Canada will no longer be a committed shipper on the Trans Mountain oil pipeline after assigning its contracts to another party, reports Reuters.