BNK Petroleum acquires Spanish shale acreage
Trofagas Hidrocarburos, S.L., a wholly owned subsidiary of BNK Petroleum Inc., has been awarded an oil and gas concession totalling approximately 234,000 acres located mainly in the autonomous community of Castile and Leon, Spain.
This concession brings the Company’s total acreage in Europe to about 3.8 million net acres in 5 separate basins.
Located in the Cantabrian basin of Spain, the concession has been acquired principally for shale gas targets but also has some conventional oil and gas potential. The primary target is a Jurassic-aged shale, which based on available information ranges, in the most prospective areas, from 100 to over 200 metres in gross thickness at depths of about 2500 to 4500 metres.
The structure and stratigraphy are defined by numerous existing 2D seismic lines and dozens of wells which were drilled by other operators. Most of the previously drilled wells had oil and/or gas shows in the shale interval as well as in fractured carbonates both above and below the shale. These fractured carbonates are the conventional targets.
In order to retain the concession, BNK Petroleum has to conduct geological work in the first year of ownership, drill two wells each in years two, three and four and drill three wells in year five.
The company has also commenced completion operations on the Lebork S-1 well which entails rigging up equipment, cleaning out the wellbore and performing formation evaluation tests prior to fracture stimulations.
Read the article online at: https://www.worldpipelines.com/business-news/21092011/bnk_petroleum_acquires_spanish_shale_acreage/
You might also like
World Pipelines Podcast: Going global with IPLOCA
In this episode, Elizabeth Corner speaks to Georges Hage, Executive Secretary at IPLOCA, about IPLOCA's insights on the culture and characteristics of the pipeline contractor community, and how it works to support sustainable energy infrastructure.
Eni and the UK Government reach financial close for the Liverpool Bay CCS project
The project foresees the efficient repurposing of part of the offshore platforms as well as 149 km of onshore and offshore pipelines, and the construction of 35 km of new pipelines to connect industrial emitters to the Liverpool Bay CCS network.