Skip to main content

Forum Energy Technologie’s (FET) latest LARS model launches onto the market with a compact, all-in-one package

Published by , Assistant Editor
World Pipelines,


Forum Energy Technologies (FET) has unveiled its latest innovation in subsea handling equipment, the Model 6000 (M6000) Launch and Recovery System (LARS).

Forum Energy Technologie’s (FET) latest LARS model launches onto the market with a compact, all-in-one package

Part of FET’s Dynacon product line, the M6000 provides a compact, all-in-one solution for inspection and light work-class ROV operations. It integrates the A-frame, winch and hydraulic power unit into a single skid-mounted package, allowing for a single-point lift with no need for additional cabling or hose connections. This design streamlines mobilisation and demobilisation, significantly reducing vessel interface time and onboard footprint.

The first M6000 system, equipped with a Perry Super Mohawk ROV was delivered to a US-based client this year and is already in operational service. The system was manufactured and tested at FET’s US manufacturing facility in Bryan, Texas, allowing client interface and witnessing during the fabrication process.

Developed for deployment with inspection and small work-class ROVs such as FET’s Comanche and Super Mohawk, the system delivers optimal performance for inspection, maintenance and repair (IMR), cable lay, and pipeline or structural inspections. Applications are versatile, ranging from wind farms and dam surveys to pre-survey and light construction tasks.

Key features include a gimbal docking head with swing and sway functionality, a compact footprint and pre-wired, plug-and-play electrical integration. Together, these developments enhance safety and efficiency by minimising setup time and maximising reliability in the field.

The M6000’s design is DNV-certified and incorporates the latest hydraulic and control technologies. With a safe working load of up to 5,200kg and umbilical capacity of 3300 m, it provides robust handling performance within a reduced footprint.

The model was brought into production in 2025 following successful field deployment with a client earlier this year.

Kevin Taylor, Vice President at FET Subsea, said: “The M6000 reflects our ongoing commitment to deliver more integrated solutions for subsea operators to maximise cost effectiveness. By combining all topside components in a single compact package, we’re helping customers mobilise faster and operate more efficiently. This is a system built with versatility and performance at the forefront.”

Built at FET’s US manufacturing facility in Bryan, Texas and supported by the company’s global network, the M6000 is now available to order.

Read the article online at: https://www.worldpipelines.com/product-news/28042026/forum-energy-technologies-fet-latest-lars-model-launches-onto-the-market-with-a-compact-all-in-one-package/

You might also like

 

 The World Pipelines Podcast

A podcast series for energy professionals featuring short, insightful interviews with experts who can shed light on topics that matter to you and your business. Subscribe on your favourite podcast app to start listening today.

Amazon Music  Apple Podcasts  Spotify Podcasts  YouTube

 

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Subsea pipeline news