Skip to main content

SDI celebrated 500 completed projects

Published by , Senior Editor
World Pipelines,


Scientific Drilling International (SDI) has announced the completion of its 500th MagTraC MWD Ranging project earlier this month.

SDI introduced MagTraC MWD Ranging ™ to the industry back in 1998 to target challenging applications where uncertainty and risk play a major factor in well construction. For those unfamiliar with this unique solution - MagTraC utilises the raw MWD data to calculate the relative position between wellbores. 

The 500th project required SDI to drill two boreholes with only three meters of spacing for their client in Saskatchewan, Canada with the intent of running electrical cables from surface to existing underground mine shafts. Utilising SDI’s high accuracy MWD, and Keeper Wireline gyro, as well as strategically ranging on the second well at five different intervals ensured that the strict anti-collision requirements were met and the successful completion of the job.

“The completion of our 500th project is a significant milestone for the enterprise and our Canadian team and client was proud to be part of the momentous occasion for the organisation”, stated Chris Chia, SDI’s Director of Technical Services.


Adapted from a press release by David Bizley

Read the article online at: https://www.worldpipelines.com/product-news/25072014/sdi-celebrated-500-completed-projects/

You might also like

World Pipelines podcast

The World Pipelines Podcast

Juan Caballero, Chair of the AMPP Board of Directors, talks about AMPP’s global efforts to prevent corrosion and to protect assets, offering insight into how the association listens to its members and serves the pipeline industry.

Listen for free today at www.worldpipelines.com/podcasts or subscribe and review on your favourite podcast app.

Apple Podcasts  Spotify Podcasts  YouTube

 
 
 

Embed article link: (copy the HTML code below):