TMK-ARTROM starts production on new heat treatment line for pipes
Published by Lydia Woellwarth,
Editor
World Pipelines,
In February 2018, after a successful test phase, TMK-ARTROM based in Slatina, Romania, granted SMS group the final acceptance certificate (FAC) for the supplied tube and pipe heat treatment line. Designed for an annual capacity of 160 000 t, the new heat treatment line will be used for the production of seamless high-strength pipes up to a wall thickness of 60 mm for mechanical applications as well as of special Oil Country Tubular Goods (OCTG) pipes.
To read the full article
"TMK-ARTROM starts production on new heat treatment line for pipes"
Please sign in or register for FREE
Sign in »
Register for free »
Get started absolutely FREE in 2 minutes, plus receive a free printed magazine.
Read the article online at: https://www.worldpipelines.com/product-news/12042018/tmk-artrom-starts-production-on-new-heat-treatment-line-for-pipes/
You might also like
Report finds Canada’s new oil pipeline worth up to US$24 billion
The expanded Trans Mountain pipeline, which started operation earlier this year, is worth as much as CAN$33.4 billion (US$24 billion) based on the assumption that shipping contracts are renewed in the early 2040s.