According to NDT Global, in 2013, a new gas line with internal stainless steel CRA cladding experienced a failure. This 16 in. pipeline was commissioned early in 2013 and occasionally used. The failure consisted of circumferential cracking in a girth weld at a pipe bend. The investigation team recommended a complete inspection of all weld joints on this 10 km line.

Verifying pipeline threats with UT

Ultrasonic ILI was the only feasible means to inspect this line, which required a liquid coupling medium to be introduced. Due to the importance of the pipeline, a sequence of two inspection runs was selected. The first run was completed using an NDT Global ultrasonic circumferential crack (UCc) tool to address the detection of circumferential cracks and crack-like anomalies. The second tool selected was the ultrasonic metal loss with pitting resolution (UMp) tool to detect metal loss anomalies, pitting, laminations and inclusions.

Associated risks were reduced by NDT Global taking full responsibility of preparing and cleaning the line along with a complete re-establishment procedure. All inspection results were independently verified to be highly accurate.

Express reports were delivered within 5 days of each run and full reports within the agreed timelines. Express reporting has been instrumental in bringing back the pipeline to normal operation.

Read the article online at: https://www.worldpipelines.com/product-news/10012017/verifying-pipeline-threats-with-ut/

You might also like

Decouplers making a difference

Jay Warner, Dairyland Electrical Industries, USA, Jerzy Sibila and Jerzy Mossakowski, CORRSTOP, Poland, explain how AC mitigation is a proven technique to solve AC interference problems on pipelines, referring specifically to the use of DC decouplers.

 
 

Embed article link: (copy the HTML code below):