Rose Rock Midstream completes cleanup effort in Carrizo Springs
Published by Rosalie Starling,
Editor - Hydrocarbon Engineering
World Pipelines,
Rose Rock Midstream, L.P. has completed its environmental assessment and cleanup in relation to an incident involving a company crude oil transport truck on 15 January 2015. The incident happened on Highway 83 west of Carrizo Springs, Texas. Both lanes of that highway have been cleared and are now open to traffic.
All environmental cleanup efforts have been coordinated through local authorities and government agencies including the Railroad Commission, Texas Department of Transportation and Texas Commission of Environmental Quality.
Adapted from press release by Rosalie Starling
Read the article online at: https://www.worldpipelines.com/equipment-and-safety/19012015/rose-rock-midstream-completes-cleanup-effort-in-carrizo-springs-54/
You might also like
World Pipelines Podcast: Supporting young pipeliners
In this episode, Elizabeth Corner speaks to Josiah SooTot, Chair at Young Pipeliners International (YPI) and Pipeline Integrity Engineer at ExxonMobil, about what Young Pipeliners International does for young professionals in the pipeline industry.
Maximising productivity with maxi rig maintenance
Kelly Beller, Vermeer Corporation, USA, makes the case that operators can boost horizontal directional drilling productivity by paying attention to maxi rig parts.