Subsea Innovation announces contract win with TechnipFMC
Published by Aimee Knight,
Editorial Assistant
World Pipelines,
Subsea Innovation Ltd, part of Tekmar Group plc, has announced a contract win with TechnipFMC in Norway, building the company’s market presence in the region.
In 2018 Subsea Innovation developed a next-generation seal for their Pipe in Pipe Waterstops. Waterstop Seals provide a solution for isolating a section of flooded annulus in offshore risers or flowlines by preventing water passage to the adjacent Pipe-In-Pipe sections during installation and normal operation. The new design addresses potential challenges experienced with High Frequency Welded (HFW) pipes and seam welded pipes being introduced within the industry as part of cost-saving measures.
Subsea Innovation are one of the only suppliers in the world to have successfully tested Waterstop seals with a proven recorded on HFW and seam welded pipes. HFW or seam welded pipes often require localised polishing to improve the sealing ability; whereas Subsea Innovation’s next-generation SIStop® Waterstop Seal eliminates the need for this, sealing on pipes with greater surface defects and impurities.
The contract win demonstrates the global demand for the next-generation seal.
The product was designed and developed from Subsea Innovation’s head office in Darlington.
Dave Thompson, Managing Director of Subsea Innovation, said: “Norway is a major market for us. Winning this project is recognition of the hard work of the team who develop equipment for the world’s most challenging environments for the world’s biggest customers.”
Read the article online at: https://www.worldpipelines.com/contracts-and-tenders/15082019/subsea-innovation-announces-contract-win-with-technipfmc/
You might also like
World Pipelines Podcast: Going global with IPLOCA
In this episode, Elizabeth Corner speaks to Georges Hage, Executive Secretary at IPLOCA, about IPLOCA's insights on the culture and characteristics of the pipeline contractor community, and how it works to support sustainable energy infrastructure.
Eni and the UK Government reach financial close for the Liverpool Bay CCS project
The project foresees the efficient repurposing of part of the offshore platforms as well as 149 km of onshore and offshore pipelines, and the construction of 35 km of new pipelines to connect industrial emitters to the Liverpool Bay CCS network.