Skip to main content

IOPTC and ZOGPI view Transneft’s onsite pipeline calibration and testing

Published by , Editor
World Pipelines,


Transneft Diascan was visited by a delegation from Iranian Oil Pipeline Telecommunication Company (IOPTC) as well as by representatives of Ziya Oil & Gas Pipeline Inspection (ZOGPI). The visit took place on 11 April 2017.

IOPTC and ZOGPI view Transneft’s onsite pipeline calibration and testing

The guests attended the operation of the liquid test ground, a unique and unrivalled hydraulic engineering structure, where new inline inspection tools of the company’s own production are tested. The calibration and testing of the currently used equipment are also performed on this facility.

IOPTC and ZOGPI representatives got acquainted with the process of preparing a magnetic defectoscope, its placement inside the pipeline and its withdrawal. The test run results were shown at the information processing section. In addition, the delegation visited the polyurethane and composite materials shop, taking great interest in manufactured products.

The visit ended in a meeting. During the meeting representatives of Iranian business shared their high opinion about the activities of Transneft Diascan. The sides discussed possible forms of co-operation between Transneft, Transneft Diascan, IOPTC and ZOGPI.

Read the article online at: https://www.worldpipelines.com/business-news/24042017/ioptc-and-zogpi-view-transnefts-onsite-pipeline-calibration-and-testing/

You might also like

 

EACOP announces closing of its first financing tranche

EACOP Ltd., the company in charge of the construction and future operation of the East African Crude Oil Pipeline project from Kabaale in Uganda to Tanga in Tanzania, has announced that it has closed the first tranche of external financing for the project.

 
 

Embed article link: (copy the HTML code below):