Skip to main content

Severstal will deliver another batch of pipes for the Yamal LNG project

Published by , Digital Assistant Editor
World Pipelines,


JSC Severstal Distribution (included in the division Severstal Russian Steel) has announced it will ship in December approximately 3000 t of pipes produced by LLC Severstal TPZ Sheksna for Yamal LNG.

Severstal TPZ Sheksna produce products with diameters from 159 mm to 325 mm in thickness 5 - 8 mm. The length of the tubes, unlike the previous batch, when produced 16 m pipes, standard - 12 m.

The pipes are made of low-alloy, structural steel 09G2S.

Total in 2015 TPZ Sheksna will produce for the project Yamal LNG about 8000 t of pipes.

Edited from press release by

Read the article online at: https://www.worldpipelines.com/business-news/16122015/severstal-to-deliver-pipes-for-the-yamal-lng-project-1822/

You might also like

Decouplers making a difference

Jay Warner, Dairyland Electrical Industries, USA, Jerzy Sibila and Jerzy Mossakowski, CORRSTOP, Poland, explain how AC mitigation is a proven technique to solve AC interference problems on pipelines, referring specifically to the use of DC decouplers.

 
 

Embed article link: (copy the HTML code below):