Sino-Kazakhstan oil and gas co-operation agreement signed in Beijing
Published by Lydia Woellwarth,
Editor
World Pipelines,
On 8 June, Wang Yilin met in Beijing with Kazakh President Nazarbayev, who is paying a state visit in China and attending the Shanghai Co-operation Organisation Summit in Qingdao. Wang has also held talks with Bozumbayev, Kazakhstan’s Minister of Energy, and Sauat Mynbayev, CEO of KazMunayGas (KMG), respectively.
After the talks, Wang Yilin and Bozumbayev signed the Agreement on Extension of Petroleum Contracts and Deepening Oil and Gas Co-operation between China National Petroleum Corporation and Ministry of Energy of Kazakhstan. Both parties agreed to further energy co-operation and make new contributions to the economic and trade development of the two countries. The two sides also exchanged views on issues including increasing Kazakhstan's natural gas exports to China and strengthening the construction of oil and gas production facilities.
Mambayev extended his congratulations on the signing of the co-operation agreement between CNPC and the Ministry of Energy of Kazakhstan. Then he exchanged views with Wang Yilin on natural gas sales, pipeline operations and other related issues.
President Nazarbayev highly praised the achievements of CNPC in the Sino-Kazakhstan oil and gas co-operation, and awarded Wang Yilin the Friendship Medal of the Republic of Kazakhstan, which is the highest honour bestowed by Kazakhstan on a foreign entrepreneur.
Read the article online at: https://www.worldpipelines.com/business-news/14062018/sino-kazakhstan-oil-and-gas-co-operation-agreement-signed-in-beijing/
You might also like
World Pipelines Podcast: Going global with IPLOCA
In this episode, Elizabeth Corner speaks to Georges Hage, Executive Secretary at IPLOCA, about IPLOCA's insights on the culture and characteristics of the pipeline contractor community, and how it works to support sustainable energy infrastructure.
Construction begins on Greensand’s carbon dioxide transit terminal at Port Esbjerg
When the tanks are full, the liquefied carbon dioxide will be loaded onto a dedicated carrier from Royal Wagenborg and shipped to the INEOS Nini platform in the Danish North Sea. From there, it will be safely injected via pipeline into subsurface reservoirs approximately 1800 m beneath the seabed for permanent storage.