Profile: Unified Gas Supply System of Russia
The UGSS of Russia
- 168.9 thousand km of gas trunk lines and branches.
- 247 gas pipeline compressor stations.
- 45.9 million kW of capacity.
- 22 underground gas storage facilities.
- The largest gas transmission system in the world.
- A unique complex of gas extraction, processing, transmission, storage and distribution.
- The system has a substantial reliability margin and is capable of uninterrupted gas supplies.
- Gazprom own the UGSS of Russia.
Operational reliability
- Gazprom report that the sustainable operation of gas mains is secured through inspection, preventative maintenance and repair.
- Due to the above breakdowns in 2013 totalled only eight compared to 32 in 2002.
Capacity
- In 2013, 659.4 billion m3 of gas was pumped into the UGSS.
- The capacity is going to be increased to meet the demand of domestic Russian consumers and the international obligations on Russia.
Access
- Gazprom has said that it satisfies all requests from independent gas producers who wish to access the UGSS, unless technical reasons prevent it.
- The Federal Law on Gas Supply in the Russian Federation governs the interaction between Gazprom and other gas producers.
- The above law sets all terms and conditions for granting access to free transmission in UGSS.
- In 2013 Gazprom rendered transmission services to 24 independent gas producers.
- In 2013 the share of independent producers in the gas transmission system was 104.3 billion m3.
- The Russian Federal Tariff Service sets the rate of gas transmission by independent producers through the trunk lines of OAO Gazprom.
Underground gas storage
- UGS facilities are an integral part of the UGSS.
- UGS facilities are situated in key gas consumption regions in Russia.
- The facilities supply Russian consumers with more than 20% of total gas volumes during heating season and 40% in particularly cold periods.
- There are 22 UGS facilities in the Russian Federation with a capacity of 69 billion m3.
- Gazprom also has three UGS facilities in Belarus, making working gas capacity 69.94 billion m3.
- Gazprom hit a record daily withdrawal rate for the history of the UGS of 725.2 million m3/d on 31 January 2013.
- A key objective for Gazprom is the expansion of UGS capacity.
- Gazprom uses European UGS facilities in Austria, the UK, Germany, Serbia and Latvia.
- Gazprom’s storage capacity in Europe grew from 1.4 – 4.5 billion m3 between 2006 and 2013.
- Between 2006 and 2013 Gazprom’s daily deliverable level from Europe increased from 18.2 – 35.7 million m3.
- Gazprom Group has operated the Banatski Dvor UGS facility in Serbia since 2011 with a view to secure reliability for Russia gas exports to Hungary and Bosnia and Herzegovina.
- Gazprom Group and MND Group signed an agreement in March 2013 on a new UGS facility in Damborice, Czech Republic.
- Construction of the above facility will begin this year and commissioning is scheduled for 2016.
- Gazprom Group is conducting feasibility studies for joint UGS projects in the UK, France, Romania and Turkey.
Based on a Q&A with Gazprom.
Adapted by Claira Lloyd
Read the article online at: https://www.worldpipelines.com/business-news/13082014/ugss-of-russia-with-gazprom/
You might also like
World Pipelines Podcast: UK pipeline perspectives
In this episode, we look at the work of the Pipeline Industries Guild, in facilitating connections and learning for pipeliners of all kinds in the UK.
Penspen to deliver feasibility study revalidation for Trans-Saharan Gas Pipeline project
Penspen, an international energy consultancy, has been awarded a contract to provide a feasibility study update for the Trans-Saharan Gas Pipeline (TSGP), a landmark infrastructure project with the potential to transform African energy dynamics, enhance economic integration, and bolster global energy security.