Transneft Central Siberia performs routine oil pipeline repairs
Published by Lydia Woellwarth,
Editor
World Pipelines,
Transneft Central Siberia has performed scheduled repairs of line sections of the Aleksandrovskoye – Anzhero-Sudzhensk oil trunk pipeline.
The company's repair and operational staff replaced three valves and conducted midlife repairs of two valves.
During a scheduled shutdown of the Aleksandrovskoye – Anzhero-Sudzhensk oil trunk pipeline, a substandard air escape valve was removed and the main line oil pump at Aleksandrovskoye oil pumping station was replaced.
The oil pipeline was put into operation again on schedule.
Repairs were performed by employees of central maintenance divisions of the following regional oil pipeline directorates (RPD): Tomsk RPD, Parabel RPD and Strezhevoy RPD.
All repairs were performed within the framework of the Integrated Technical Upgrading, Revamping, and Overhaul Programme of Transneft Central Siberia to ensure the uninterrupted and safe operation of oil trunk pipelines.
Read the article online at: https://www.worldpipelines.com/business-news/12072018/transneft-central-siberia-performs-routine-oil-pipeline-repairs/
You might also like
New digital map of underground pipes and cables on track to grow economy
The emerging digital map of power and broadband cables, gas and water pipes and other underground infrastructure is set to grow the economy by £5 billion.