Transneft Central Siberia performs routine oil pipeline repairs
Published by Lydia Woellwarth,
Editor
World Pipelines,
Transneft Central Siberia has performed scheduled repairs of line sections of the Aleksandrovskoye – Anzhero-Sudzhensk oil trunk pipeline.
The company's repair and operational staff replaced three valves and conducted midlife repairs of two valves.
During a scheduled shutdown of the Aleksandrovskoye – Anzhero-Sudzhensk oil trunk pipeline, a substandard air escape valve was removed and the main line oil pump at Aleksandrovskoye oil pumping station was replaced.
The oil pipeline was put into operation again on schedule.
Repairs were performed by employees of central maintenance divisions of the following regional oil pipeline directorates (RPD): Tomsk RPD, Parabel RPD and Strezhevoy RPD.
All repairs were performed within the framework of the Integrated Technical Upgrading, Revamping, and Overhaul Programme of Transneft Central Siberia to ensure the uninterrupted and safe operation of oil trunk pipelines.
Read the article online at: https://www.worldpipelines.com/business-news/12072018/transneft-central-siberia-performs-routine-oil-pipeline-repairs/
You might also like
World Pipelines Podcast: Working shoulder to shoulder, with TDW
In this episode, Elizabeth Corner speaks to Matt Romney, Product Line Director for Pipeline Integrity, T.D. Williamson, about TDW's perspective on the benefits of working with pipeline membership organisations.
Seamless gas segregation
Razal Kabeer, Project Engineer, STATS Group, Abu Dhabi, UAE, discusses how precision pipeline intervention has enabled seamless gas segregation in a project in Oman.