Skip to main content

Transneft Central Siberia performs routine oil pipeline repairs

Published by , Editor
World Pipelines,


Transneft Central Siberia has performed scheduled repairs of line sections of the Aleksandrovskoye – Anzhero-Sudzhensk oil trunk pipeline.

The company's repair and operational staff replaced three valves and conducted midlife repairs of two valves.

During a scheduled shutdown of the Aleksandrovskoye – Anzhero-Sudzhensk oil trunk pipeline, a substandard air escape valve was removed and the main line oil pump at Aleksandrovskoye oil pumping station was replaced.

The oil pipeline was put into operation again on schedule.

Repairs were performed by employees of central maintenance divisions of the following regional oil pipeline directorates (RPD): Tomsk RPD, Parabel RPD and Strezhevoy RPD.

All repairs were performed within the framework of the Integrated Technical Upgrading, Revamping, and Overhaul Programme of Transneft Central Siberia to ensure the uninterrupted and safe operation of oil trunk pipelines.

Read the article online at: https://www.worldpipelines.com/business-news/12072018/transneft-central-siberia-performs-routine-oil-pipeline-repairs/

You might also like

 

 The World Pipelines Podcast

A podcast series for energy professionals featuring short, insightful interviews with experts who can shed light on topics that matter to you and your business. Subscribe on your favourite podcast app to start listening today.

Amazon Music  Apple Podcasts  Spotify Podcasts  YouTube

 

 
 

Embed article link: (copy the HTML code below):