New senior metallurgist at Exova
Published by Elizabeth Corner,
Senior Editor
World Pipelines,
Global testing group Exova has appointed Cliff McGuire to the newly-created position of principal metallurgist for its European Oil and Gas business.
Cliff has an extensive background in metals processing and commercial metallurgical services, and is a Fellow of the Institute of Materials, Minerals and Mining.
He previously worked with Exova before moving to Premier Hytemp, an Exova customer, as group metallurgist.
Returning to Exova, he brings experience across a range of sectors, including energy, aerospace and civil engineering, and extensive knowledge of alloys, materials manufacturing and failure mechanisms.
In his new role, Cliff will be responsible for training and mentoring, quality control and development of best practice.
Lee Best, Technical Engineering Director for Oil and Gas and Industrials Europe at Exova, said: “The introduction of a new principal metallurgist role is a strategic move that will enhance the technical and operational support we provide to our customers.
“As a recognised specialist in his field, Cliff will play a valuable role in enhancing our high levels of quality and service provision, as well as leading ongoing development of our metallurgical teams throughout the UK and Europe.”
Edited from source by Elizabeth Corner
Read the article online at: https://www.worldpipelines.com/business-news/08122015/new-senior-metallurgist-at-exova/
You might also like
World Pipelines Podcast: Going global with IPLOCA
In this episode, Elizabeth Corner speaks to Georges Hage, Executive Secretary at IPLOCA, about IPLOCA's insights on the culture and characteristics of the pipeline contractor community, and how it works to support sustainable energy infrastructure.
Construction begins on Greensand’s carbon dioxide transit terminal at Port Esbjerg
When the tanks are full, the liquefied carbon dioxide will be loaded onto a dedicated carrier from Royal Wagenborg and shipped to the INEOS Nini platform in the Danish North Sea. From there, it will be safely injected via pipeline into subsurface reservoirs approximately 1800 m beneath the seabed for permanent storage.