Natural gas pipeline news
Energy Transfer announces FERC approval on Rover Pipeline
Energy Transfer announces FERC approval for final two laterals on the Rover Pipeline.
Expand your corrosion expertise with these valuable pipeline resources
NACE International has a collection of technical resources, standards and papers meant to strengthen your pipeline Corrosion Management System through information on procedures, tips, and techniques for corrosion control.
PipePillo – a fundamental shift in the way pipelines are supported
Garrett Wilde, PipeSak Pipeline Products, explains why the PipePillo, a structured pipeline pillow, is now being routinely chosen by contractors in North America as their preferred pipeline support method.
Overcoming heavy bore restrictions – a Quest Integrity case study
A look at how Quest Integrity assisted a major oil transportation company in Canada with obtaining a complete data set for a sour gas pipeline using an ultrasonic in-line inspection tool.
Cheniere seeks regulator approval for Midship pipeline
Cheniere has asked the FERC for approval of its Midship natural gas pipeline.
Three types of Denso™ protection systems for gas pipeline project in Dubai, UAE
DUSUP (Dubai Supply Authority) recently specified Denso Protal 7200™ liquid epoxy coating for a buried gas pipeline project in Dubai, UAE. DUSUP required three solutions for three different types of infrastructure, and Winn & Coales (Denso) Ltd's experience in corrosion prevention enabled them to provide a number of solutions.
EUGAL pipeline fully approved
Work to construct the European Gas Pipeline Link (EUGAL) in Mecklenburg-Western Pomerania has been given the go-ahead.
Plans to put into service remainder of TEAL gas pipeline
Enbridge plans to place more of the Ohio TEAL natural gas pipeline in service.
Creaform: New features, improved capability, faster analysis and reporting pipeline inspection software now capable of assessing full pipe joints
Creaform examines why many pipeline owners are now asking service companies to use an NDT 3D technology solution to perform pipeline inspections and ensure that their integrity assessments are completed in the shortest time possible.
HDD method used for construction of GAZ-SYSTEM’s pipeline
As part of the construction of the Tworóg–Kedzierzyn-Kozle gas pipeline, the HDD method was utilised.