North America to lead the global trunk/transmission pipeline length
Published by Sara Simper,
Editorial Assistant
World Pipelines,
GlobalData’s latest report, ‘Oil and Gas Pipelines Length and Capacity and Capital Expenditure (CapEx) Forecast by Region, Countries and Companies, 2022-2026’, reveals that the total length of the global trunk/transmission pipeline network is expected to be 2.2 million km by 2026. North America will be on top, with 970 231 km, followed by Asia and Europe with 257 104 km and 213 187 km, respectively.
Sudarshini Ennelli, Oil and Gas Analyst at GlobalData, comments: “Being a traditional hub for oil and gas, North America not only has a huge installed pipeline base but it continues to build new pipelines to meet demand. By 2026, the region intends to start operations at 112 planned and announced pipelines, with a total length of around 20 022 km. The San Fernando-Cactus in Mexico is the longest upcoming pipeline in the region, with a length of 1609 km. This announced natural gas pipeline is expected to start operations in 2023.”
GlobalData’s research finds that Asia will rank in second place by 2026, with a 12% share of the global transmission pipeline length. The region’s total length will be 257104 km. The Xinjiang–Guangdong–Zhejiang SNG natural gas pipeline in China will be the longest pipeline in the region, with a length of 8972 km, and is expected to start operations by 2026. The region’s pipeline additions are rapidly growing to meet the demand of oil and gas.
Europe ranks third place, with a 10% share in the global transmission pipeline length. Europe’s total length will be 213187 km, with the Varna-Oryahovo gas pipeline in Bulgaria to represent the largest stretch with a length of 844 km. This project is expected to start operations by the end of 2022, and is expected to bring additional gas transportation capacity to the country.
Read the article online at: https://www.worldpipelines.com/special-reports/07072022/north-america-to-lead-the-global-trunktransmission-pipeline-length/
You might also like
World Pipelines Podcast: Going global with IPLOCA
In this episode, Elizabeth Corner speaks to Georges Hage, Executive Secretary at IPLOCA, about IPLOCA's insights on the culture and characteristics of the pipeline contractor community, and how it works to support sustainable energy infrastructure.
Construction begins on Greensand’s carbon dioxide transit terminal at Port Esbjerg
When the tanks are full, the liquefied carbon dioxide will be loaded onto a dedicated carrier from Royal Wagenborg and shipped to the INEOS Nini platform in the Danish North Sea. From there, it will be safely injected via pipeline into subsurface reservoirs approximately 1800 m beneath the seabed for permanent storage.