Skip to main content

Special reports - 01 September 2022

C.H.M. Construction digging track trenching for water infrastructure projects

To do water installs right in rocky conditions takes a special machine that achieves optimal production while keeping costs in check. Meet the Vermeer T755 Commander 3 trencher; the machine that reduces operating costs and delivers efficient and productive installation methods on projects.