Update on the ‘golden junction’
RN-Vankor has announced it is finishing the construction of a linear sector of Suzun-Vankor intrafield oil pipeline.
RN-Vankor has announced it is finishing the construction of a linear sector of Suzun-Vankor intrafield oil pipeline.
After a recent investment agreement was signed between the TAPI pipeline shareholders, the Asian Development Bank is confident in the ability to construction the pipeline through Afghanistan’s most violent areas.
The Canadian company won out over Sempra unit Ienova, which was disqualified from bidding.
Keystone pipeline is put back into service at reduced pressure.
DNV GL has launched the first globally applicable guidance for leak detection systems for offshore fields.
The line was shut over the weekend after a potential leak was spotted.
Amarinth is developing close relationships with EU EPC companies, to supply bespoke pumps for use in the Middle East.
Wood Group has acquired SVT Engineering Consultants (SVT) based in Perth, Australia.
The PennEast pipeline project has been delayed. After the FERC released the updated timeline of approval for the application, the final decision must now be made by March 2017.
OleumTech has effectively solved major pipeline automation challenges for a global oil and gas producer’s pigging systems.
Hill International has been awarded a contract to support the construction of the Trans Adriatic Pipeline project.
Izhora pipe mill is set to supply approximately 140 thousand t of large diameter pipes for the major Russian gas transmission projects.
Corinth Pipeworks and SMS Group join forces for enhanced product ranges.
EVRAZ North America has praised the CBSA’s announcement that it has initiated an investigation into allegations by EVRAZ of dumping and subsidisation of large diameter welded line pipe products from China.
Harkand has been awarded an inspection campaign with TAQA in UKCS.