Skip to main content

NGL announces Grand Mesa pipeline upsize

World Pipelines,


NGL Energy Partners LP has announced its decision to increase the size of its 100% owned Grand Mesa Pipeline to a higher capacity 20 in. design. The decision to expand was based on initial shipper commitments and additional volumes committed to Rimrock Midstream, LLC’s 150 mile DJ Basin gathering system that is currently under development which will tie into Grand Mesa Pipeline at Lucerne, Colorado.

The larger pipeline provides area producers a reliable and cost-effective takeaway option out of the basin capable of transporting over 200 000 bpd.

The Grand Mesa Pipeline system will include over 550 miles of new crude oil transportation pipeline, multiple truck injection bays, over 1 million bbls of operational storage, and at least two origination points located near Lucerne and Kersey (Riverside Station) in Weld County, Colorado. The system is in active development and is scheduled to commence service in Q4 2016. Rimrock will construct and operate the pipeline system.


Adapted from press release by Hannah Priestley-Eaton

Read the article online at: https://www.worldpipelines.com/project-news/19022015/ngl-announces-grand-mesa-pipeline-upsize/

You might also like

World Pipelines podcast

The World Pipelines Podcast

Juan Caballero, Chair of the AMPP Board of Directors, talks about AMPP’s global efforts to prevent corrosion and to protect assets, offering insight into how the association listens to its members and serves the pipeline industry.

Listen for free today at www.worldpipelines.com/podcasts or subscribe and review on your favourite podcast app.

Apple Podcasts  Spotify Podcasts  YouTube

 
 
 

Embed article link: (copy the HTML code below):