New MicroMax current interrupter for CP surveys in remote areas
Published by Lydia Woellwarth,
Editor
World Pipelines,
American Innovations has released the MicroMax GPS360, a portable current interrupter designed for cathodic protection surveyors who need to interrupt facilities in remote locations. Instead of relying on a large external battery to power the interrupter in these areas, surveyors can use the GPS360. Weighing in just over 3 lb, it can interrupt up to 100 amps for over 60 hrs without a power source. In addition to a built-in battery, the GPS360 includes other hallmarks of the MicroMax product line: an integrated relay, rugged design, and a form-factor small enough to fit inside most rectifier cabinets.
"Portable interruption can be a headache for many of our customers, especially those who work in remote areas,” said Christopher Shawhan, Director of Product Management at American Innovations. “By eliminating the need to select the right relay, get the wiring polarity correct, find a way to keep the interrupter secure, and bring an external power source, we think the GPS360 will significantly improve the efficiency of our customers’ cathodic protection surveys. We’re excited about this release and we look forward to developing future products that serve our customers’ needs.”
Read the article online at: https://www.worldpipelines.com/product-news/16052018/new-micromax-current-interrupter-for-cp-surveys-in-remote-areas/
You might also like
World Pipelines Podcast: Going global with IPLOCA
In this episode, Elizabeth Corner speaks to Georges Hage, Executive Secretary at IPLOCA, about IPLOCA's insights on the culture and characteristics of the pipeline contractor community, and how it works to support sustainable energy infrastructure.
Construction begins on Greensand’s carbon dioxide transit terminal at Port Esbjerg
When the tanks are full, the liquefied carbon dioxide will be loaded onto a dedicated carrier from Royal Wagenborg and shipped to the INEOS Nini platform in the Danish North Sea. From there, it will be safely injected via pipeline into subsurface reservoirs approximately 1800 m beneath the seabed for permanent storage.