HFT introduces inflatable stoppers
Published by Anna Nicklin,
Assistant Editor
World Pipelines,
Huntingdon Fusion Techniques (HFT) has released its Inflatable Pipestopper®. Its inflatable stopper helps to reduce the volume in pipes or tanks for weld purging, to block pipe ends or to open orifices in systems in order to conduct routine maintenance.
HFT has made its range of both standard and non-standard inflatable pipe stoppers available for tanks, chambers, tubes, pipes, pipework fabrications and ductwork.
All of HFT’s inflatable stoppers are manufactured with a strong internal latex balloon, covered in a waterproof polyurethane coated nylon bag for low friction and to prevent the production of static electricity or accidental sparking.
Chairman for HFT, Ron Sewell, commented: “These versatile inflatable stoppers are used to service a wide variety of industrial applications. They provide a strong barrier in pipeline activities in order to prevent foreign bodies from entering the line during downtime.”
In machining applications, the stoppers can be inserted below a horizontal flange on a vertical pipe. This prevents machining fluid, swarf and stops tools from falling into expensive machinery – such as pumps and turbines.
When welding large tanks and vessels, the stoppers can dramatically reduce the volume inside so that the argon purging process takes little time and uses a minimum amount of expensive gas.
The HFT inflatable stoppers are particularly useful when one or more can be inserted into a small opening close to a work location, rather than at the end of the pipe, tank or vessel. Moreover, no high-pressure equipment is needed for inflation.
Edited from various sources by Anna Nicklin
Read the article online at: https://www.worldpipelines.com/product-news/14092016/hft-introduces-inflatable-stoppers/
You might also like
World Pipelines Podcast: Going global with IPLOCA
In this episode, Elizabeth Corner speaks to Georges Hage, Executive Secretary at IPLOCA, about IPLOCA's insights on the culture and characteristics of the pipeline contractor community, and how it works to support sustainable energy infrastructure.
Construction begins on Greensand’s carbon dioxide transit terminal at Port Esbjerg
When the tanks are full, the liquefied carbon dioxide will be loaded onto a dedicated carrier from Royal Wagenborg and shipped to the INEOS Nini platform in the Danish North Sea. From there, it will be safely injected via pipeline into subsurface reservoirs approximately 1800 m beneath the seabed for permanent storage.