Capturing reality
AVEVA has highlighted the usefulness of having a photographic record of key equipment items through the design, fabrication and installation process.
The average plant design project involves hundreds of thousands of changes to information, from minor attribute changes to major equipment change outs. According to AVEVA, discussions and decisions about these changes form part of the everyday review and approval process based on the current information available, such as catalogue, specification, geometry, attribute and process information.
The physical appearance of fabrication and construction arguably provides a new and uniquely accurate description of the environment in which the design must be implemented. 3D laser capture can allow this source of information to be brought to the design team for change resolution.
Photographs offer a more easily accessible and cheaper route for sending information through to designers. The context offered by photographs can have a positive effect on the design collaboration. If fabricators are able to capture images of the progress of a project and send them through directly to the designers authoring tool, linked to the object, then the designer would be provided with a new perspective on their design and would be immediately able to spot obvious discontinuities. Hence, photographs arguably represent a new opportunity to add value to the client during commissioning and start up.
Adapted from press release by Emma McAleavey.
Read the article online at: https://www.worldpipelines.com/product-news/12052014/aveva_on_photographs_in_plant_design_projects_58/
You might also like
World Pipelines Podcast: Going global with IPLOCA
In this episode, Elizabeth Corner speaks to Georges Hage, Executive Secretary at IPLOCA, about IPLOCA's insights on the culture and characteristics of the pipeline contractor community, and how it works to support sustainable energy infrastructure.
Construction begins on Greensand’s carbon dioxide transit terminal at Port Esbjerg
When the tanks are full, the liquefied carbon dioxide will be loaded onto a dedicated carrier from Royal Wagenborg and shipped to the INEOS Nini platform in the Danish North Sea. From there, it will be safely injected via pipeline into subsurface reservoirs approximately 1800 m beneath the seabed for permanent storage.