Amarinth to supply pumps for Middle East projects
Amarinth is developing close relationships with EU EPC companies, to supply bespoke pumps for use in the Middle East.
Amarinth is developing close relationships with EU EPC companies, to supply bespoke pumps for use in the Middle East.
The National Energy Board is the first North American regulator to require comprehensive emergency procedures manuals from oil and gas pipeline companies to be published online.
DNV GL is calling for a standardised system qualification approach and joint industry effort to drive faster take-up of new technology.
Chevron and Wolverine pipeline companies win API Distinguished Safety and Environmental Award.
Telvent Canada Ltd and IntelliView Technologies Inc. have announced their agreement to collaborate and deliver IntelliView’s video analytics based leak detection technology.
Wood Group has acquired SVT Engineering Consultants (SVT) based in Perth, Australia.
The new courses feature an expanded focus on the practical aspects of using OPC Technology in day-to-day situations.
The future of oil and gas technology looks increasingly automated, digital and smarter according to a new Technology Outlook report published by DNV GL.
Possible pipeline leak in South Dakota: TransCanada is analysing the pipe
“Get back to basics,” says IMCA expert who is due to speak at offshore lifting conference.
Huntingdon Fusion Techniques HFT® has launched the hand held, battery powered PurgEye® 200 Weld Purge Monitor, which meets the needs of higher welding specifications requiring oxygen levels down to as low as 10 ppm.
Trelleborg Sealing Solution’s seal manufacturing facility in Tewkesbury, England, is believed to be the first of its kind to obtain a prestigious international quality standard.
Mintlaw Academy has won an annual competition, which sees pupils from across Scotland put underwater robots they have designed and built to the test.
A new study has revealed that over 700 miles of Great Lakes shoreline could be damaged if an oil spill from Enbridge’s Line 5 occurs. Enbridge has commented on this report.
The PennEast pipeline project has been delayed. After the FERC released the updated timeline of approval for the application, the final decision must now be made by March 2017.