UK Forties pipeline system: “small” leak found
A "small" leak on the Forties pipeline in Aberdeenshire is being repaired.
A "small" leak on the Forties pipeline in Aberdeenshire is being repaired.
Enbridge Inc.’s Line 5 pipeline temporarily shutdown, following November deal with state.
Trelleborg Offshore to manufacture buoyancy system for Landing String Solutions LLC.
NACE International institute unveils new corrosion management tool.
Oceaneering transforms TerminalSmart system into logistical hub for entire facility, from docks to tanks and pipelines.
The flight marks one of the longest robotic journeys in the small UAS class.
Jan De Nul wins award for pipeline handling safety.
The crude pipeline is still operating at 20% pressure following a restart.
Trelleborg is continuing to help improve safety in offshore environments in the Gulf of Mexico.
Ashtead Technology has boosted its rental fleet with an investment of £1 million in the latest iXblue technology.
H-100 gas turbine successfully completes low NOx testing.
Trelleborg has developed a new rotating buoyancy module to create safe buckling zones for subsea pipelines.
New animated videos explain pipeline construction process.
Milliken Infrastructure awarded patents for polyolefin repair method.
Keystone pipeline spills 5000 bbls of oil: TransCanada shuts pipeline.