SkyX drone completes 100 km flight over gas pipeline
The flight marks one of the longest robotic journeys in the small UAS class.
The flight marks one of the longest robotic journeys in the small UAS class.
Jan De Nul wins award for pipeline handling safety.
The crude pipeline is still operating at 20% pressure following a restart.
Trelleborg is continuing to help improve safety in offshore environments in the Gulf of Mexico.
Ashtead Technology has boosted its rental fleet with an investment of £1 million in the latest iXblue technology.
H-100 gas turbine successfully completes low NOx testing.
Trelleborg has developed a new rotating buoyancy module to create safe buckling zones for subsea pipelines.
New animated videos explain pipeline construction process.
Milliken Infrastructure awarded patents for polyolefin repair method.
Keystone pipeline spills 5000 bbls of oil: TransCanada shuts pipeline.
Metegrity announces the release of Pipeline Enterprise SaaS 1.7 for pipeline construction.
The National Energy Board has issued an Information Advisory to all regulated energy companies based on findings from a new audit process, which aims to help prevent future incidents.
TransCanada has responded to an oil leak from its Keystone pipeline in Amherst, South Dakota.
ASME Global Pipeline award given at Rio Pipeline 2017.
Lightweight ergonomic design ideal for pipeline repair and field joint coating.