GPT announces upgrade to isolation gasket
Published by Elizabeth Corner,
Senior Editor
World Pipelines,
Garlock Pipeline Technologies (GPT) – manufacturer of critical pipeline sealing and electrical Isolation products – has announced the unveiling of an upgraded offering to its EVOLUTION®.
The next generation of isolation gaskets, EVOLUTION is now available in sizes from 0.5 in. nominal pipe size (NPS) to 36 in. NPS, in addition EVOLUTION is offered as a Full Face (Type E) gasket.
The EVOLUTION Isolating gasket which was launched a year ago marked a significant step change in the design and manufacturer of Isolation gasketing. Designed to meet the ever the increasing demands of oil and gas transmission, today and in the future.
EVOLUTION isolates flanges to prevent galvanic corrosion and to optimise cathodic protection systems as well as providing unparalleled sealing performance ensuring greater joint integrity.
EVOLUTION® is the first fully encapsulated isolation gasket ever, providing; the highest dielectric strength ever developed for an isolation product ; the highest-pressure capability of any isolating product ever developed; the most chemical resistance of any isolation gasket ever developed; the tightest seal of any isolation product ever developed.
An acceleration in H2S(sour gas) levels as operators drill deeper and more aggressively causes traditional GRE products to become vulnerable over time. Through extensive testing EVOLUTION has demonstrated virtually no permeation or degradation, eliminating this costly problem.
Rated from -300 °F(-184 °C) to 500 °F (260 °C), EVOLUTION can operate under high and cryogenic temperatures. Tested comprehensively for safety, the product has API 6FB, 3rd Edition Fire Test recognition.
As with existing GPT high pressure isolation gaskets, EVOLUTION features: pressure energised seals, a fire safe Inconel 718 c-ring, built to match pipe bore, a short moment arm, moisture and humidity resistance, zero creep relaxation, additional benefit of easier installation and a 316LSS core.
Read the article online at: https://www.worldpipelines.com/equipment-and-safety/19012021/gpt-announces-upgrade-to-isolation-gasket/
You might also like
World Pipelines Podcast: Going global with IPLOCA
In this episode, Elizabeth Corner speaks to Georges Hage, Executive Secretary at IPLOCA, about IPLOCA's insights on the culture and characteristics of the pipeline contractor community, and how it works to support sustainable energy infrastructure.
Construction begins on Greensand’s carbon dioxide transit terminal at Port Esbjerg
When the tanks are full, the liquefied carbon dioxide will be loaded onto a dedicated carrier from Royal Wagenborg and shipped to the INEOS Nini platform in the Danish North Sea. From there, it will be safely injected via pipeline into subsurface reservoirs approximately 1800 m beneath the seabed for permanent storage.