Transneft Diascan upgrades 28 in. UT tool
Published by Elizabeth Corner,
Senior Editor
World Pipelines,
Transneft Diascan has upgraded its ultrasonic flaw detector for inline inspections of 28 in. pipelines. The newly upgraded inline inspection device was marked as 28.USD.04, which means that it belongs to the 4th generation of ultrasonic defectoscopes.
The key purpose of the upgrade was to improve the detectability of flaws found in dents. The upgraded device is equipped with a new WM sensor carrier with enhanced runners’ flexibility on which adaptive bars with sensors on moving suspension elements are installed. This allows the sensors to be properly in contact with the pipe’s surface at the place of deformation within dents and buckles, thus making it possible to detect and measure such defects as scratch marks, metal loss and lamination located within dents and buckles. It should also be noted that the number of WM sensors has been increased 1.8-fold on the new carrier, which decreases the distance between sensors along the circumference.
The upgrading was carried out from April 2016 to November 2018. The flaw detector underwent acceptance testing at Transneft Diascan’s test ground as well as within a section of an operating oil pipeline.
Earlier, Transneft Diascan upgraded a similar defectoscope for inspection of 40 to 48 in. pipelines.
Read the article online at: https://www.worldpipelines.com/equipment-and-safety/17122018/transneft-diascan-upgrades-28-in-ut-tool/
You might also like
The World Pipelines Podcast
Juan Caballero, Chair of the AMPP Board of Directors, talks about AMPP’s global efforts to prevent corrosion and to protect assets, offering insight into how the association listens to its members and serves the pipeline industry.
Listen for free today at www.worldpipelines.com/podcasts or subscribe and review on your favourite podcast app.
Qapqa have signed a contract for the supply of automatic welding equipment and services
Qapqa have signed a contract for the supply of automatic welding equipment and services with A-HAK Pijpleidingen Saudi for ARAMCO’s Master Gas System-3 Project.