Permasense opens Asia-Pacific base
Published by Angharad Lock,
Digital Assistant Editor
World Pipelines,
Permasense has opened a base in Kuala Lumpur, Malaysia to serve the Asia-Pacific region. Say-Heng Ng has been appointed as President of Permasense Asia-Pacific to lead the operation.
Say-Heng was most recently Vice President and Managing Director of Baker Hughes in South East Asia. In his new role, Say-Heng will have full responsibility for Permasense’s activities, including business development, client support and managing the company’s overall operations from India to Korea and Australia.
“Our technology is helping operators across the world make better informed decisions about their assets – helping them reduce OPEX while sustaining production levels and maintaining safety standards. This is why we’re continuing to grow rapidly through these challenging times,” commented Peter Collins, Permasense CEO. “This expansion will allow us to deliver improved, in time zone support to our Asia-Pacific clients. Say-Heng’s deep local knowledge and industry expertise will be invaluable as we increase our footprint in the region.”
“Permasense has an exceptionally dynamic team,” added Say-Heng Ng. “Over the past two decades, I have seen first-hand the benefits that Permasense’s systems can make to the industry. I am excited to be leading the charge for Permasense in this region, and providing operators with the real business benefit that comes with a holistic understanding of their asset integrity.”
Permasense Asia Pacific Sdn Bhd is located at L-07-01, Level 7, Block L, Solaris Mont Kiara, No. 2, Jalan Solaris Mont Kiara, 50480 Kuala Lumpur, Malaysia.
Edited from press release by Angharad Lock
Read the article online at: https://www.worldpipelines.com/equipment-and-safety/09022016/permasense-opens-asia-pacific-base-170/
You might also like
World Pipelines Podcast: Going global with IPLOCA
In this episode, Elizabeth Corner speaks to Georges Hage, Executive Secretary at IPLOCA, about IPLOCA's insights on the culture and characteristics of the pipeline contractor community, and how it works to support sustainable energy infrastructure.
Construction begins on Greensand’s carbon dioxide transit terminal at Port Esbjerg
When the tanks are full, the liquefied carbon dioxide will be loaded onto a dedicated carrier from Royal Wagenborg and shipped to the INEOS Nini platform in the Danish North Sea. From there, it will be safely injected via pipeline into subsurface reservoirs approximately 1800 m beneath the seabed for permanent storage.