DSS and VEGA to develop EUREKA tool
Delta SubSea (DSS), leading integrated independent provider of Subsea Services and Solutions, signed a development agreement with VEGA Americas Inc. (VEGA) to develop a subsea gamma ray hydrate localisation tool known as EUREKA.
The EUREKA will be developed to locate hydrate plug formations. The tool will use a non-contact technology; sensor components will be unaffected by process pressure, temperature, or corrosive properties. The system is able to detect minimal differences of density on media in the pipeline. The density difference from gas, oil, wax, asphaltene, hydrates, sand allows the system to localise with precision the location of total or partial blockage, in the pipe.
Scott Dingman, Delta SubSea President – Chief Executive Officer, said “This framework agreement reflects Delta SubSea’s strategy to develop cutting edge Tooling Solutions and lead the industry in developing reliable methods of diagnosing flow abnormalities and to assess the integrity of pipelines. Our goal is to be able to provide a tool that is able to detect the issue on pipelines and intervene quickly to reinstate production.”
The ROV operable, EUREKA, is frame equipped with source holder, detector, electronic canister, buoyancies, rollers and a propulsion system that allows the tool to move along the pipe at variable speeds from 1 - 20 ft/min depending on the content of the pipeline and the nature of the plug. Some benefits of the tool include: no production interruption, no risk of stuck pig, no coating removal, fast measurements, and immediate visualisation of the results.
Adapted from press release by Hannah Priestley-Eaton
Read the article online at: https://www.worldpipelines.com/contracts-and-tenders/30042015/dss%20and%20vega%20to%20develop%20eureka%20tool/
You might also like
World Pipelines Podcast: Going global with IPLOCA
In this episode, Elizabeth Corner speaks to Georges Hage, Executive Secretary at IPLOCA, about IPLOCA's insights on the culture and characteristics of the pipeline contractor community, and how it works to support sustainable energy infrastructure.
Construction begins on Greensand’s carbon dioxide transit terminal at Port Esbjerg
When the tanks are full, the liquefied carbon dioxide will be loaded onto a dedicated carrier from Royal Wagenborg and shipped to the INEOS Nini platform in the Danish North Sea. From there, it will be safely injected via pipeline into subsurface reservoirs approximately 1800 m beneath the seabed for permanent storage.