Technip extends flexible pipe contract
Published by Stephanie Roker,
Editor
World Pipelines,
Technip has signed a four year extension of its five year initial contract, signed in January 2011 with Petrobras S.A. for its flexible pipes logistic base (BAVIT), located in Vitória, Brazil.
The scope covers storage, handling, inspection, testing, load-out (two simultaneous vessel load-out points), internal cleaning and maintenance of flexibles pipes. The base has a 300 t handling capacity, storage capacity for 220 reels and serves as the main load-out point for all pre-salt flexible pipes.
Adriano Novitsky, President of Technip in Brazil, commented: “Technip is very proud of this contract. In 2016, the logistic base has reached the significant milestone of eight years of operation without lost time injury. This achievement demonstrates that the culture of HSE has become sustainable and the renewal of this contract is a demonstration that we have been performing as expected by our client, ensuring high standards of quality and safety in the operations.”
This award recognises Technip’s position in Brazil leveraging its full integration, which covers engineering, fabrication, logistic and installation.
Edited from source by Stephanie Roker
Read the article online at: https://www.worldpipelines.com/contracts-and-tenders/27042016/technip-extends-flexible-pipe-contract/
You might also like
World Pipelines Podcast: Going global with IPLOCA
In this episode, Elizabeth Corner speaks to Georges Hage, Executive Secretary at IPLOCA, about IPLOCA's insights on the culture and characteristics of the pipeline contractor community, and how it works to support sustainable energy infrastructure.
Oil and gas companies add renewable fuels to low-carbon portfolio, says GlobalData
Share of fossil fuels in the world’s energy mix declined from 82% in 2022 to 81.5% in 2023.