Corinth Pipeworks awarded onshore linepipe contract
Published by Lydia Woellwarth,
Editor
World Pipelines,
Corinth Pipeworks has been awarded a major onshore linepipe contract by Energinet, comprising 142 km of 32 in., 36 in. and 40 in. SAWL and SAWH steel pipes with three-layer polyethylene anti-corrosion coating, epoxy lining for flow assurance and bends.
The linepipe contract awarded to Corinth Pipeworks forms the Danish onshore part (Energinet Lot 3) of the Baltic Pipe pipeline and comprises 47 000 t of steel pipes. Corinth Pipeworks’ proposal was evaluated and ranked first amongst other international manufacturers, as being the most advantageous in terms of price, production quality, delivery and contract terms.
Pipes manufacturing and coating will take place at Corinth Pipeworks’ facilities in Greece. Deliveries are planned to start at the beginning of 2021 and conclude in five months.
The present award is a continuation of the overall Baltic Pipe project, another part of which was awarded to Corinth Pipeworks in 2019 (Lot 1 offshore Energinet Baltic pipe project). Baltic Pipe project is a major gas infrastructure project that aims at creating a new supply corridor for gas in the European gas market. The new gas pipeline will connect the existing Norwegian gas network in the North Sea with the Danish and Polish gas transmission networks.
Energinet is the Danish national transmission system operator for natural gas and electricity. It is an independent public enterprise owned by the Danish Ministry of Climate, Energy and Utilities.
Read the article online at: https://www.worldpipelines.com/contracts-and-tenders/13052020/corinth-pipeworks-awarded-onshore-linepipe-contract/
You might also like
The World Pipelines Podcast
Juan Caballero, Chair of the AMPP Board of Directors, talks about AMPP’s global efforts to prevent corrosion and to protect assets, offering insight into how the association listens to its members and serves the pipeline industry.
Listen for free today at www.worldpipelines.com/podcasts or subscribe and review on your favourite podcast app.
Glenfarne and PTT sign cooperation agreement including offtake from Alaska LNG
The Alaska LNG project consists of an 807 mile 42 in. pipeline capable of transporting enough natural gas to meet both Alaska’s domestic needs and supply the full 20 million tpy Alaska LNG export facility.