McDermott awarded three offshore contracts by Saudi Aramco
Published by Aimee Knight,
Editorial Assistant
World Pipelines,
McDermott continues its decades-long partnership with Saudi Aramco with three new awards for engineering, procurement, construction and installation (EPCI) projects.
In total, McDermott will provide EPCI of four drilling jackets and seven oil production deck modules (PDMs) in Saudi Arabia's Zuluf, Ribyan, Abu Sa'fah and Safaniya fields located offshore in the Arabian Gulf.
"These awards are a direct result of our long track record of successfully delivering shallow water infrastructure for Saudi Aramco and our commitments to the growth of Saudi Arabia's energy sector as well as In-Kingdom execution in line with Vision 2030," said Tareq Kawash, McDermott's Senior Vice President, Europe, Middle East and Africa.
In addition to the seven PDMs and four drilling jackets, the scope of work for the three contract release purchase orders (CRPOs) includes EPCI of more than 28 miles (45 km) of pipelines, more than 62 miles (100 km) of subsea cables and tie-in works to existing facilities. Fabrication is expected to begin in the first quarter of 2022, with offshore installation commencing fourth quarter of 2022 and overall completion expected second quarter of 2023.
Read the article online at: https://www.worldpipelines.com/contracts-and-tenders/08122021/mcdermott-awarded-three-offshore-contracts-by-saudi-aramco/
You might also like
World Pipelines Podcast: Going global with IPLOCA
In this episode, Elizabeth Corner speaks to Georges Hage, Executive Secretary at IPLOCA, about IPLOCA's insights on the culture and characteristics of the pipeline contractor community, and how it works to support sustainable energy infrastructure.
Construction begins on Greensand’s carbon dioxide transit terminal at Port Esbjerg
When the tanks are full, the liquefied carbon dioxide will be loaded onto a dedicated carrier from Royal Wagenborg and shipped to the INEOS Nini platform in the Danish North Sea. From there, it will be safely injected via pipeline into subsurface reservoirs approximately 1800 m beneath the seabed for permanent storage.