TAP to deliver the first gas exit point in Fier, Albania
On 6 July 2021, Trans Adriatic Pipeline (TAP) AG, the Albanian Ministry of Infrastructure and Energy and Albgaz Sh.a. signed a Cooperation and Handover Agreement on the Fier South Facility.
On 6 July 2021, Trans Adriatic Pipeline (TAP) AG, the Albanian Ministry of Infrastructure and Energy and Albgaz Sh.a. signed a Cooperation and Handover Agreement on the Fier South Facility.