McDermott awarded EPFC contract for storage tanks in Canada
Published by Aimee Knight,
Editorial Assistant
World Pipelines,
McDermott International Ltd. has announced CB&I Storage Solutions has been awarded a large contract by a major EPC contractor for the engineering, procurement, fabrication and construction (EPFC) of 14 tanks in Burnaby, British Columbia. The tanks are part of the Trans Mountain Expansion Project, which will increase the nominal capacity of the Trans Mountain Pipeline System from 300 000 to 890 000 bpd.
The scope of the contract includes 14 flat-bottom atmospheric storage tanks of various sizes up to 185 ft (56.4 m) in diameter. The engineering and installation of the tanks will be performed by Canadian workers.
"This award demonstrates the confidence major international contractors place in our world-class storage and EPFC solutions," said Cesar Canals, Senior Vice President of CB&I Storage Solutions. "For more than a century, CB&I Storage Solutions has maintained a strong track record of execution excellence in Canada."
The award will be reflected in McDermott's 2Q20 backlog.
Read the article online at: https://www.worldpipelines.com/contracts-and-tenders/07072020/mcdermott-awarded-epfc-contract-for-storage-tanks-in-canada/
You might also like
World Pipelines Podcast: Going global with IPLOCA
In this episode, Elizabeth Corner speaks to Georges Hage, Executive Secretary at IPLOCA, about IPLOCA's insights on the culture and characteristics of the pipeline contractor community, and how it works to support sustainable energy infrastructure.
Construction begins on Greensand’s carbon dioxide transit terminal at Port Esbjerg
When the tanks are full, the liquefied carbon dioxide will be loaded onto a dedicated carrier from Royal Wagenborg and shipped to the INEOS Nini platform in the Danish North Sea. From there, it will be safely injected via pipeline into subsurface reservoirs approximately 1800 m beneath the seabed for permanent storage.