TechnipFMC awarded a significant integrated EPCI (iEPCI™) subsea contract for the BP Thunder Horse Expansion project
Published by Aimee Knight,
Editorial Assistant
World Pipelines,
TechnipFMC has been awarded a significant integrated Engineering, Procurement, Construction and Installation (iEPCI™) contract by BP for the Thunder Horse South Expansion 2 Project located in the Gulf of Mexico.
TechnipFMC will manufacture, deliver and install subsea equipment, including subsea tree systems, manifolds, flowline, umbilicals and subsea tree jumpers, pipeline end terminations, subsea distribution and topside control equipment. This is the second iEPCI™ awarded to TechnipFMC by BP following Atlantis Phase 3 in the first quarter of 2019.
Arnaud Pieton, President Subsea at TechnipFMC, commented: “We are very pleased to have been awarded this iEPCI™ contract for BP in the Gulf of Mexico. This award confirms the trust we have built over the long term with BP and demonstrates the continued adoption of our iEPCI™ offering.” The Thunder Horse field is located in Mississippi Canyon Blocks 776, 777 and 778, in the Boarshead Basin, 200 km south-east of New Orleans. It is one of the largest fields in the Gulf of Mexico and lies at a water depth of 1830 m.
Read the article online at: https://www.worldpipelines.com/contracts-and-tenders/07052019/technipfmc-awarded-a-significant-integrated-epci-iepci-subsea-contract-for-the-bp-thunder-horse-expansion-project/
You might also like
World Pipelines Podcast: Going global with IPLOCA
In this episode, Elizabeth Corner speaks to Georges Hage, Executive Secretary at IPLOCA, about IPLOCA's insights on the culture and characteristics of the pipeline contractor community, and how it works to support sustainable energy infrastructure.
Construction begins on Greensand’s carbon dioxide transit terminal at Port Esbjerg
When the tanks are full, the liquefied carbon dioxide will be loaded onto a dedicated carrier from Royal Wagenborg and shipped to the INEOS Nini platform in the Danish North Sea. From there, it will be safely injected via pipeline into subsurface reservoirs approximately 1800 m beneath the seabed for permanent storage.