WoodMac: Permian midstream bottlenecks may choke output
Natural gas is the weakest link as basin’s production grows, URTeC delegates are told.
Natural gas is the weakest link as basin’s production grows, URTeC delegates are told.
The company has acquired and placed into service the 16 in. Norphlet deepwater gathering pipeline system.
GAZ-SYSTEM has selected the contractor for the Poland-Slovakia gas pipeline.