Baker Botts comments on new PHMSA rules
Published by Elizabeth Corner,
Senior Editor
World Pipelines,
The US Department of Transportation’s Pipeline and Hazardous Materials Safety Administration (PHMSA) is proposing new requirements for natural gas pipelines.
While the new requirements aim to enhance the safety of pipeline development and maintenance, they could also significantly increase the regulation burden pipeline companies face.
Baker Botts’ client alert on the proposed rules can be found here.
The proposed rules are available for review. Comments must be submitted within 60 days of publication in the Federal Register.
"The significant growth in the nation's production, usage and commercialisation of natural gas is placing unprecedented demands on the nation's pipeline system," said US Transportation Secretary Anthony Foxx in the announcement of the proposed requirements. "This proposal includes a number of commonsense measures that will better ensure the safety of communities living alongside pipeline infrastructure and protect our environment."
The proposed measures would call for, among other things, an increase in the monitoring and inspection of pipelines located outside of high consequence areas, an expansion of the regulation of onshore gas gathering, seismicity analyses to mitigate the threat of outside force, enhanced measures to manage corrosion and enhanced repair criteria for pipelines outside of high consequence areas.
Edited from source by Elizabeth Corner
Read the article online at: https://www.worldpipelines.com/business-news/24032016/baker-botts-comments-on-new-phmsa-rules/
You might also like
World Pipelines Podcast: Going global with IPLOCA
In this episode, Elizabeth Corner speaks to Georges Hage, Executive Secretary at IPLOCA, about IPLOCA's insights on the culture and characteristics of the pipeline contractor community, and how it works to support sustainable energy infrastructure.
Construction begins on Greensand’s carbon dioxide transit terminal at Port Esbjerg
When the tanks are full, the liquefied carbon dioxide will be loaded onto a dedicated carrier from Royal Wagenborg and shipped to the INEOS Nini platform in the Danish North Sea. From there, it will be safely injected via pipeline into subsurface reservoirs approximately 1800 m beneath the seabed for permanent storage.