New ASCE publication provides framework to project future weather and climate extremes
Published by Elizabeth Corner,
Senior Editor
World Pipelines,
The American Society of Civil Engineers (ASCE) latest publication, Impacts of Future Weather and Climate Extremes on United States Infrastructure: Assessing and Prioritising Adaptation Actions, summarises the likely changes in various extreme meteorological and hydrological events and assesses the vulnerabilities of infrastructure within critical sectors and their collective interdependencies.
Prepared by Task Committee on Future Weather and Climate Extremes, the report identifies five critical infrastructure sectors: energy; transportation; drinking water and wastewater; water storage and flood protection; and navigation. Each sector is reviewed with respect to the potential impacts of climate change pertinent to that sector, current sector fragility or resilience to such impacts, adaptation readiness, and dependency on or contribution to other sectors. A proposed step-by-step prioritisation process is included along with examples of case-specific prioritisation frameworks used by other organisations.
Policy makers and engineers involved in infrastructure planning and design, from the federal level to local stakeholders, will find this book a helpful guide in accommodating projected future weather and climate extremes for their locale.
Read the article online at: https://www.worldpipelines.com/business-news/20102021/new-asce-publication-provides-framework-to-project-future-weather-and-climate-extremes/
You might also like
World Pipelines Podcast: Going global with IPLOCA
In this episode, Elizabeth Corner speaks to Georges Hage, Executive Secretary at IPLOCA, about IPLOCA's insights on the culture and characteristics of the pipeline contractor community, and how it works to support sustainable energy infrastructure.
Construction begins on Greensand’s carbon dioxide transit terminal at Port Esbjerg
When the tanks are full, the liquefied carbon dioxide will be loaded onto a dedicated carrier from Royal Wagenborg and shipped to the INEOS Nini platform in the Danish North Sea. From there, it will be safely injected via pipeline into subsurface reservoirs approximately 1800 m beneath the seabed for permanent storage.