Gazprom and Gasunie discuss infrastructure projects
Published by Angharad Lock,
Digital Assistant Editor
World Pipelines,
A working meeting between Alexey Miller, Chairman of the Gazprom Management Committee, and Han Fennema, Chairman of the Executive Board of Gasunie, took place recently at the St. Petersburg International Economic Forum 2016.
The parties discussed key areas of collaboration between the companies, including the Framework Agreement on cooperation in the small-scale LNG sector. Particular focus was on the progress of the pilot project for the construction of a small-scale loading terminal in the port of Rostock (Germany).
Alexey Miller and Han Fennema also addressed the development of gas transmission routes from Russia to Europe, emphasising the success of the Nord Stream gas pipeline. Gazprom exported about 20 billion m3 of gas via Nord Stream from January to June of this year, which represents a 25% increase from the same period of 2015.
The meeting participants stressed that, in the context of the rising demand for natural gas imports across Europe, the expansion of direct gas transmission routes from Russia would serve as an additional guarantee of reliable gas supplies to European consumers. Han Fennema pointed out the need to define optimal routes inside the EU for delivering gas to consumers.
Edited from press release by Angharad Lock
Read the article online at: https://www.worldpipelines.com/business-news/20062016/gazprom-and-gasunie-discuss-infrastructure-projects-233/
You might also like
World Pipelines Podcast: Going global with IPLOCA
In this episode, Elizabeth Corner speaks to Georges Hage, Executive Secretary at IPLOCA, about IPLOCA's insights on the culture and characteristics of the pipeline contractor community, and how it works to support sustainable energy infrastructure.
Construction begins on Greensand’s carbon dioxide transit terminal at Port Esbjerg
When the tanks are full, the liquefied carbon dioxide will be loaded onto a dedicated carrier from Royal Wagenborg and shipped to the INEOS Nini platform in the Danish North Sea. From there, it will be safely injected via pipeline into subsurface reservoirs approximately 1800 m beneath the seabed for permanent storage.