US appeals court says Bayou Bridge pipeline construction can proceed
Published by Lydia Woellwarth,
Editor
World Pipelines,
Energy Transfer Partners’ Bayou Bridge crude oil pipeline in the Atchafalaya Basin of Louisiana can resume construction following a US appeals court overturning a District Court’s preliminary injunction that was filed in February.
The court filing stated: "Judge Shelly Dick's ruling ran counter to the collective efforts of federal, state, and local regulatory officials, who thoroughly reviewed – and ultimately approved – the Bayou Bridge pipeline for construction.”
The lawsuit was filed three weeks ago by the Atchafalaya Basinkeeper, the Louisiana Crawfish Producers, Gulf Restoration Network, Waterkeeper Alliance and the Sierra Club to challenge the US Army Corps of Engineers’ finding of no significant impact from the project. On 16 March, an appeals court reversed the decision made by a lower court on the aforementioned environmental lawsuit to halt construction of the pipeline.
Energy Transfer Partners on 16 March said it was pleased with the court ruling and would begin mobilising for construction activities as soon as possible.
The project is 60% owned by Energy Transfer Partners with the remainder controlled by refiner Phillips 66. ETP has said stopping construction in the basin would cost it nearly US$1 million daily and US$25 million monthly, however, were unspecific with the actual cost.
Read the article online at: https://www.worldpipelines.com/business-news/19032018/us-appeals-court-says-bayou-bridge-pipeline-construction-can-proceed/
You might also like
World Pipelines Podcast: Going global with IPLOCA
In this episode, Elizabeth Corner speaks to Georges Hage, Executive Secretary at IPLOCA, about IPLOCA's insights on the culture and characteristics of the pipeline contractor community, and how it works to support sustainable energy infrastructure.
Construction begins on Greensand’s carbon dioxide transit terminal at Port Esbjerg
When the tanks are full, the liquefied carbon dioxide will be loaded onto a dedicated carrier from Royal Wagenborg and shipped to the INEOS Nini platform in the Danish North Sea. From there, it will be safely injected via pipeline into subsurface reservoirs approximately 1800 m beneath the seabed for permanent storage.