Wood Group seeks JIP support
Published by Stephanie Roker,
Editor
World Pipelines,
Wood Group is calling for expressions of interest from technology vendors to support a joint industry project (JIP) which aims to reduce subsea equipment failures in Australia and provide a recommended practice for the subsea industry.
The Subsea Equipment Australian Reliability (SEAR) JIP is a partnership supported by six operators and led by Wood Group Kenny. The focus is on collaboration and knowledge sharing in order to improve subsea equipment design for Australia’s challenging offshore warm water environment and to avoid costly interventions.
Bob MacDonald, CEO of Wood Group Kenny, said: “The SEAR JIP has already underlined how significant the issue of subsea failures is; with five fields in Australia having more than 100 failures over a six year operating period. The associated cost of the intervention campaigns only was around AUS$150 million. Reducing costly failures is even more important in the current low oil price environment.
“There are a number of areas where improved collaboration can realise tangible benefits for oil and gas operations. We are now asking vendors to come forward with technology solutions to help address the specific challenges faced in Australian waters. Of particular interest are novel coating technologies and materials which will improve the ease of equipment change out and intervention campaigns.”
The testing initiative follows a review of subsea equipment performance to date in Australia and provides the opportunity for vendors to test the performance of technologies in-situ over a number of years.
Edited from source by Stephanie Roker
Read the article online at: https://www.worldpipelines.com/business-news/19022016/wood-group-seeks-jip-support/
You might also like
World Pipelines Podcast: Going global with IPLOCA
In this episode, Elizabeth Corner speaks to Georges Hage, Executive Secretary at IPLOCA, about IPLOCA's insights on the culture and characteristics of the pipeline contractor community, and how it works to support sustainable energy infrastructure.
Construction begins on Greensand’s carbon dioxide transit terminal at Port Esbjerg
When the tanks are full, the liquefied carbon dioxide will be loaded onto a dedicated carrier from Royal Wagenborg and shipped to the INEOS Nini platform in the Danish North Sea. From there, it will be safely injected via pipeline into subsurface reservoirs approximately 1800 m beneath the seabed for permanent storage.