New lathe expands Sulzer’s facility capability
Published by Anna Nicklin,
Assistant Editor
World Pipelines,
Since industrial gas turbines are increasing in size, repair facilities that overhaul and restore these machines must also keep pace. A key tool is a large lathe.
A leading industrial gas turbine and rotor repair provider, Sulzer, has recently upgraded its largest rotating equipment service centre in La Porte, Houston, by installing a state-of-the-art, large and versatile lathe. The addition of this modern equipment ensures that the La Porte service centre now offers complete repair and balancing services for industrial gas turbines.
The new lathe was based on current designs of large gas turbine rotors. Specifically designed for versatility and to accommodate modern turbine rotors, the lathe has a 200 000 lbs capacity, with a 76 ft (23 m) over bedway and 14 ft (4.25 m) swing.
The lathe complements many other state-of-the-art machines, including a large low-speed dynamic balancing machine with a 200 000 lbs capacity and a vertical stacking system. The combination and arrangement of this equipment will make efficient use of the workshop space and speeds up workflow by reducing the time required to repair a rotor.
Billy Bottera, Manager of Gas Turbine Rotor Repairs commented: “This large lathe significantly improves the workflow in our turbine rotor repair bay, allowing us to streamline work on larger turbines. Its versatile design will ensure that the final machining operations are completed more efficiently by alleviating previous bottle-necks in the system.”
Adapted from press release by Anna Nicklin
Read the article online at: https://www.worldpipelines.com/business-news/17082016/new-lathe-expands-sulzers-facility-capability/
You might also like
World Pipelines Podcast: Going global with IPLOCA
In this episode, Elizabeth Corner speaks to Georges Hage, Executive Secretary at IPLOCA, about IPLOCA's insights on the culture and characteristics of the pipeline contractor community, and how it works to support sustainable energy infrastructure.
Construction begins on Greensand’s carbon dioxide transit terminal at Port Esbjerg
When the tanks are full, the liquefied carbon dioxide will be loaded onto a dedicated carrier from Royal Wagenborg and shipped to the INEOS Nini platform in the Danish North Sea. From there, it will be safely injected via pipeline into subsurface reservoirs approximately 1800 m beneath the seabed for permanent storage.