iTAC Software AG helped to ensured that the first phase of the Baltic pipeline laying process was both safe and efficient
German Chancellor Angela Merkel and the Russian President Dimitry Medvedev have symbolically opened the valve on the 1200 km long Baltic Sea Pipeline that connects Russia's natural gas reserves with Europe.